The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6

Authors

  • Topan Department of Civil Engineering, Hasanuddin University, Makassar, Indonesia
  • Rita Tahir Lopa Department of Civil Engineering, Hasanuddin University, Makassar, Indonesia
  • Bambang Bakri Department of Civil Engineering, Hasanuddin University, Makassar, Indonesia
Volume: 15 | Issue: 5 | Pages: 27400-27405 | October 2025 | https://doi.org/10.48084/etasr.13165

Abstract

The delays in land acquisition are frequently an obstacle to the execution of construction projects in Indonesia, particularly the ones involving large-scale national infrastructure. This study examines the impact of land acquisition delays on the time and cost performance of construction project implementation, using the Bekasi River Flood Control Project, Package 6, as a case study. A quantitative approach was employed utilizing an explanatory sequential design that integrated primary and secondary project data collected from 32 respondents via a questionnaire. The results from the Simple Linear Regression (SLR) analysis indicate that the land acquisition delays have a strong, significant effect on the project duration with R2 = 0.380 and p < 0.001, and a moderate, significant effect on the project cost with R2 = 0.181 and p = 0.015. In practice, a 16 month delay in land acquisition led to a 454 day extension in project duration and an increase in costs by approximately IDR 7.5 billion, which is the 2.304% of the original contract value.

Keywords:

land acquisition delays, time deviation, cost deviation, construction project

Downloads

Download data is not yet available.

References

F. A. Soomro, M. J. Memon, A. F. Chandio, S. Sohu, and R. Soomro, "Causes of Time Overrun in Construction of Building Projects in Pakistan," Engineering, Technology & Applied Science Research, vol. 9, no. 1, pp. 3762–3764, Feb. 2019.

S. A. Assaf and S. Al-Hejji, "Causes of delay in large construction projects," International Journal of Project Management, vol. 24, no. 4, pp. 349–357, May 2006.

M. A. Nugraha, C. Z. Oktaviani, and A. T. Bulba, "Pengaruh Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Waktu Proyek," Jurnal Arsip Rekayasa Sipil dan Perencanaan, vol. 5, no. 1, pp. 59–68, Mar. 2022.

A. T. Bulba and C. Z. Oktaviani, "Faktor Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Kinerja Proyek Strategis Nasional (PSN) Jaringan Irigasi Aceh," Teras Jurnal : Jurnal Teknik Sipil, vol. 13, no. 1, pp. 245–252, Mar. 2023.

K. N. R. Putri and P. F. Marzuki, "Model of land acquisition productivity performance for toll road projects in Indonesia," Civil and Environmental Science Journal (CIVENSE), vol. 03, no. 02, pp. 84–94, Aug. 2020.

S. Ghimire, A. Tuladhar, and S. R. Sharma, "Governance in Land Acquisition and Compensation for Infrastructure Development," American Journal of Civil Engineering, vol. 5, no. 3, pp. 169–178, Apr. 2017.

D. A. Hermawan, T. D. Laksono, and F. Am, "Studi Faktor-Faktor Penyebab Keterlambatan Pengadaan Tanah Dan Pengaruhnya Terhadap Waktu Pelaksanaan Proyek Pembangunan Bendungan Bagong Paket 1 Di Kabupaten Trenggalek (MYC)," Journal Sains Student Research, vol. 1, no. 2, pp. 779–789, Dec. 2023.

E. Rita, N. Carlo, and Nandi, "Penyebab Dan Dampak Keterlambatan Pekerjaan Jalan Di Sumatera Barat Indonesia," Jurnal Rekayasa, vol. 11, no. 1, pp. 27–37, Jul. 2021.

S. Sohu, T. Ramadzan, O. S. Khan, S. A. Bhatti, and A. A. Sohoo, "Influential Time and Cost Factors for Commercial Projects in the Malaysian Construction Industry," Engineering, Technology & Applied Science Research, vol. 14, no. 3, pp. 14170–14174, Jun. 2024.

J. W. Creswell, Research Design: Qualitative, Quantitative and Mixed Methods Approaches, 4th ed. Los Angeles, Calif.: SAGE Publications, Inc, 2014.

Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, Dan R&d, Bandung: Alfabeta, 2016.

J. F. Hair, W. C. Black, B. J. Babin, and R. E. Anderson, Multivariate Data Analysis, 7th ed. Upper Saddle River, NJ: Pearson, 2009.

I. Ghozali, "Ghozali 2018," Aplikasi analisis multivariate dengan program IBM SPSS, vol. 25, 2018.

S. Azwar, "Reliabilitas Dan Validitas Aitem," Buletin Psikologi, vol. 3, no. 1, pp. 19–26, Sep. 2016.

D. N. Gujarati and D. C. Porter, Basic Econometrics, Boston, Mass.: McGraw-Hill Education, 2009.

Downloads

How to Cite

[1]
. Topan, R. T. Lopa, and B. Bakri, “The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6”, Eng. Technol. Appl. Sci. Res., vol. 15, no. 5, pp. 27400–27405, Oct. 2025.

Metrics

Abstract Views: 5
PDF Downloads: 3

Metrics Information