Topan, ., Lopa, R. T. and Bakri, B. (2025) “The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6”, Engineering, Technology & Applied Science Research. Greece, 15(5), pp. 27400–27405. doi: 10.48084/etasr.13165.