Topan, ., Rita Tahir Lopa, and Bambang Bakri. 2025. “The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6”. Engineering, Technology & Applied Science Research 15 (5). Greece:27400-405. https://doi.org/10.48084/etasr.13165.