Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology

Authors

  • S. H. N. Alani Civil Engineering Department, University of Baghdad, Iraq
  • A. M. R. Mahjoob Civil Engineering Department, University of Baghdad, Iraq

Abstract

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA) for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive measures to prevent threats from resulting in corruption and were examined for each threat.

Keywords:

corruption risk, bowtie, prevention, risk analysis

Downloads

Download data is not yet available.

References

"Corruption Perception Index (CPI) 2015," Transparency International. https://www.transparency.org/en/cpi/2015 (accessed May 08, 2021).

P. Zou, "Strategies for Minimizing Corruption in the Construction Industry in China," Journal of Construction in Developing Countries, vol. 11, no. 2, pp. 15–29, Dec. 2006.

E. K. Owusu, A. P. C. Chan, and M. Shan, "Causal Factors of Corruption in Construction Project Management: An Overview," Science and Engineering Ethics, vol. 25, no. 1, pp. 1–31, Feb. 2019. DOI: https://doi.org/10.1007/s11948-017-0002-4

N. A. I. M. Saim, I. A. Rahman, and M. F. Ismail, "Factors Contributing to Fraudulent Practices in Construction Project Life Cycle," International Journal of Engineering & Technology, vol. 7, pp. 647–651, Aug. 2018.

T. Y. Al-Tai, "The role of performance audit in rationalizing investment decisions for infrastructure projects," Ph.D. dissertation, Baghdad University, Baghdad, Iraq, 2014.

M. Shan, Y. Le, K. T. W. Yiu, A. P. C. Chan, Y. Hu, and Y. Zhou, "Assessing collusion risks in managing construction projects using artificial neural network," Technological and Economic Development of Economy, vol. 24, no. 5, pp. 2003–2025, Oct. 2018. DOI: https://doi.org/10.3846/20294913.2017.1303648

P. T. Nguyen and P. C. Nguyen, "Risk Management in Engineering and Construction: A Case Study in Design-Build Projects in Vietnam," Engineering, Technology & Applied Science Research, vol. 10, no. 1, pp. 5237–5241, Feb. 2020. DOI: https://doi.org/10.48084/etasr.3286

F. A. Soomro, M. J. Memon, A. F. Chandio, S. Sohu, and R. Soomro, "Causes of Time Overrun in Construction of Building Projects in Pakistan," Engineering, Technology & Applied Science Research, vol. 9, no. 1, pp. 3762–3764, Feb. 2019. DOI: https://doi.org/10.48084/etasr.2449

A. Lidstone, "The Use of Bowties to Aid the Management of Risk," 2017.

I. Voicu, F. V. Panaitescu, M. Panaitescu, L. G. Dumitrescu, and M. Turof, "Risk management with Bowtie diagrams," IOP Conference Series: Materials Science and Engineering, vol. 400, p. 082021, Sep. 2018. DOI: https://doi.org/10.1088/1757-899X/400/8/082021

D. Allen, Risk Management in Business. Cambridge, UK: Cambridge University Press, 1995.

PMBOK® Guide - A Guide to the Project Management Body of Knowledge, 6th ed. PMI (Project Management Institute, 2107.

"Ministry of Planning Government Implementation Instructions No. (1) for the year 2008." Ministry of Planning, 2008, [Online]. Available: https://mop.gov.iq/static/uploads/7/pdf/151012302174946107c03fdf610a3ea1241cbc53a2--file1.pdf.

M. Sohail and S. Cavill, "Accountability to Prevent Corruption in Construction Projects," Journal of Construction Engineering and Management, vol. 134, no. 9, pp. 729–738, Sep. 2008. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(729)

J. Hawkins, "How to Note: Reducing corruption in infrastructure sectors," Department for International Development, Jan. 2013. DOI: https://doi.org/10.12774/eod_cr.may2013.hawkins

"BowTieXP Virtual Risk Assessment," CGE Risk. https://www.cgerisk.com/products/bowtiexp/ (accessed May 08, 2021).

Downloads

How to Cite

[1]
S. H. N. Alani and A. M. R. Mahjoob, “Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology”, Eng. Technol. Appl. Sci. Res., vol. 11, no. 3, pp. 7223–7227, Jun. 2021.

Metrics

Abstract Views: 551
PDF Downloads: 509

Metrics Information

Most read articles by the same author(s)